Physical Address

304 North Cardinal St.
Dorchester Center, MA 02124

WATCH | Unhappy Ximba residents want bridge project halted

Ximba residents 
 
KWAXIMBA, KwaZulu-Natal – Unhappy KwaXimba residents in eThekwini Metro say they want a controversial bridge project halted pending the finalisation of their concerns and demands.
The project has been causing tensions and divisions in the area.
Residents marched to the site of the project demanding jobs and business opportunities for locals.
Five men were previously arrested for allegedly storming and halting the project demanding to be part of the project.
The state says they are part of a construction mafia group, an allegation the men deny.
eNCA’s Siphamandla Goge reports in the video above.
 

en_USEnglish